top of page

June 2020 7.5" Progress

Jim, James and Stephanie start the month of June by laying out main line right-of-way on the newly cleared land at Florida Agricultural Museum, Palm Coast, Florida.

2020-06-03 PART OF THE LOOP AREA TO  BE

Track building jig area all cleaned and graded.

Jim places a flag.                                        Old switch panels to be rebuilt.

View up the hill:  More right of way cleared.                                   Jim holds radius line.

Jim holds the range pole.                             Jim holds the radius tape.

James cleaning up old ties.                                  Jim holds range pole in upper loop area.

Heavy construction courtesy of new member Rich and heavy equipment operators' school.

2020-06-13 EASTERN SIDE OF THE LOOP  BY

Looking toward our two shipping containers and track-building jigs and heavy equipment for which we are so appreciative.

Leveling the containers.

Self-explanatory.

Track center line with markers.   Main line with markers.

2020-06-29 DRAIN PIPE READY TO GO    IN

Main track center line.

2020-06-29 RICH FILL IN DITCH.JPG
2020-06-29 RICH HELP TO LOAD THE    FAM

Signal conduits and new water line.

bottom of page